1, before installing the bathtub, first install the drainage fittings, and test whether there is leakage.

2, with iron bracket bath before installation to check the installation location of the ground is flat.

3, when installing the bathtub, adjust the position of the bathtub with a horizontal ruler is in the horizontal line.

4, bathtub wall parts should be maintained with the wall 3-5mm gap, and with such as soft polyethylene or similar materials for the buffer material.

5, the bottom of the bathtub and tile should stay at least 5mm of clearance.

6, bathtub skirt along the edge of the floor and decorative materials should be a 20mm gap, and cushioning materials and sealing materials to seal the gap.

7, insert the drainage fittings on the ground drain at least 50mm or more, check the connection is tight to prevent water leakage.

8, if it is installed Jacuzzi, you must set the grounding wire and earth leakage protection switch.

9, in the vicinity of the bathtub drain to leave access holes.

10, when installing the bathtub, it is best to cover the surface of the bathtub with a protective film to prevent scratches.

11, do not use cement mortar to fill the back of the bathtub to prevent damage to the bathtub.

12, gently move the installation process, do not hit the bathtub with hard objects.

13, when installing the bathtub, you can not stand in the bathtub, you can not put the weight in the bathtub, it may damage the bathtub.

14, bathtub-level accessories all installed, it is necessary to use the bathtub after 24 hours.