News

Precautions



Precautions

1, the size of the shower room embedded hole should be designed before the bathroom is not renovated.

2, has installed the best water supply system and ceramic tile shower room.

3, wiring leakage protection switchgear should be considered before installation in the shower room, so as to avoid rework.

4, shower room style according to bathroom layout may be, the common corner and a font.

5, install bathing room should be strictly according to the assembly process installation.

6, shower room must be firmly connected with the building structure, can not be shaken.

7, open-type shower room must be expansion bolts, and non-hollow wall fixed, drained, the bottom basin of water does not exceed 500 grams.

8, shower room after installation appearance to be neat and bright, sliding door and sliding door parallel to each other or vertical, symmetrical, sliding door to open and close, seamless, impermeable, shower room and the bottom between the silicone seal sealed.